Unlocking the Value of your Program Investments

Insights on governance, risk and compliance March 2015 Unlocking the value of your program investments How predictive analytics can help in achieving successful outcomes

Contents Introduction ......................................................... 1 How can you unlock the value of your program investments? ........................................................ 2 1. Are you doing the right projects? ....................... 4 2. Are you ready to run a major project? ................ 6 3. Is your project set up for success? ..................... 7 4. How well are your important projects doing? .... 10 5. Are your people aligned toward success? ......... 12 Conclusion ......................................................... 15

Introduction Project success leads to competitive advantage Companies continue to be challenged in executing complex projects. Despite the many advances in project management and development techniques, the overall ratio between successful, challenged and outright program failures has not changed significantly over the past 15 years. However, both the complexity and the costs of failure have gone up as project approaches have not kept pace with the new complexity. Based on EY’s analysis, approximately US$682b is wasted on underperforming projects across the globe annually. This wasted amount of project costs, unrealized benefits and team “burnout” is both unfortunate and unnecessary. The challenge in unlocking the full potential of an organization’s capital investment has Approximately a direct impact on market competitiveness. EY has found that organizations that are successful in delivering large and complex programs outperform their competition in the market. This means there is an urgent imperative for organizations to fundamentally US$682b improve performance on their programs and projects. is wasted on Project success must be seen in a broader perspective to fully understand how vital it is in positioning the business to thrive in the future and in building the confidence of the underperforming organization’s customers. Therefore, it is important to examine the impact of project projects across the success beyond just the short-term focus of costs, schedules and immediate benefits; also to look at the implications of achieving strategic goals, customer quality and overall globe annually. reputation in the market. While helping clients with their strategic projects, EY has gained an understanding of when and where projects get off track, and on the interdependency of the root causes of issues and risks that result in poor project performance. We have developed practical and innovative ways to help you identify the right projects to undertake, assess whether you are ready to execute them, predict where they will struggle, identify the root causes of current issues, determine if the project team is aligned to your executives’ definition of success and, most importantly, what decisions and actions are needed. The role of senior management Project success leads to competitive advantage — this means that senior management can have a profound impact on their most important company programs and thus its business success. Unlocking the value of these programs requires having the right information to decide what projects to develop that are aligned with the strategy, the ability to execute and the capacity to absorb the changes to the full effect. Obtaining the right information begins with asking the right questions. In doing so, senior management is better positioned to take a leadership approach that is proactive, comprehensive and strategic. However, to maximize investment outcomes, this new way of thinking and approach to managing strategic projects must be ingrained within all levels of the business and project structures. The journey to unlocking your program investments and this new way of thinking begins with asking a set of five basic, but important, questions: 1. Are you doing the right projects? 2. Are you ready to run a major project? 3. Is your project set up for success? 4. How well are your important projects doing? 5. Are your people aligned toward success? This report shows how portfolio management and predictive analytics can improve your project success and unlock the value of your program investments. Unlocking the value of your program investments | 1

How can you unlock the value of your program investments? Achieving initiative success requires understanding the entire program life cycle — we call this “the program and project continuum.” A misstep at any major phase along the way can have significant consequences, affecting performance and the achievement of planned outcomes. Unfortunately, the vast waste in spending for under-performing or failed projects by companies is both unnecessary and avoidable. We continue to see inadequate techniques being applied, lacking focus, and disjointed management along the full continuum. By understanding where and how programs and projects get off-track in delivering their value, you can proactively balance an early mitigating response consistent with success goals. EY has identified a series of processes and tools that will aid in improving program investment performance and deliver better value, with fewer surprises. Portfolio governance Program governance Project life cycle Idea Program portfolio Pre-planning Formation Execution Closure screening management cle y e c Lif Start Implementation Benefits delivery tions 1 2 3 4 5 s Are you Are you ready Is your project How well are Are your people Que doing the to run a set up your important aligned towards right projects? major project? for success? projects doing? success? Idea Project portfolio Complexity Predictive indicator Multi-dimensional Decision priority ools screening analysis analysis diagnostics cube risk analysis analysis T • Quickly capturing project • Linking projects to • Determining the ability of • Proactively making • Improving insights on true • Improving alignment of ideas with greatest total business strategy and the organization to execute informed decisions to project performance and executives and project teams for economic value determining gaps or against a measured project's establish the proper hidden risks to enable effective operational trade-off alue • Providing consistency and cancelation decisions complexity and inherent foundation for successful decision-making for the decisions consistent with the risk, before starting execution to avoid greatest positive project project's success objectives unbiased analysis prior to • Balancing and issues and surprises impact in-depth ROI and business prioritizing the portfolio • Increasing the ability to • Giving clarity on stage-gate case analysis/development for the greatest overall influence outcomes by • Understanding forward • Ability to focus and tune criteria for more effective team Primary v investment, risk and reward adapting the project's looking risks along processes for increased project focus and objective-based design, team, processes defined success criteria performance and optimal “Go/No-Go” decisions at and controls benefit realization implementation 2 | Unlocking the value of your program investments

Description Key objective Key activities A group of programs and/or projects managed • Strategic-fit/alignment olio in a coordinated way to support business Doing the • Governance f t strategy and to deliver benefits in line with right things • Agility or Portfolio • Financials/ P strategic objectives management investments am A set of interrelated projects, • Verification and managed in a coordinated way to Program Realizing validation ogr attain the selected program’s business management the benefits • Prioritization Pr objectives and benefits • Resources A temporary endeavor Doing • Scope ojectto create a unique Project things • Quality Pr product, service management right • Cost or result • Time Organizational success requires expanding beyond “doing things right” to include “doing the right things” Portfolio governanceProgram governance Project life cycle Idea Program portfolioPre-planningFormation Execution Closure screeningmanagement cle y e c Lif Start Implementation Benefits delivery tions123 4 5 sAre you Are you ready Is your project How well are Are your people Quedoing the to run a set up your important aligned towards right projects?major project?for success?projects doing? success? IdeaProject portfolioComplexityPredictive indicatorMulti-dimensional Decision priority oolsscreeninganalysisanalysisdiagnosticscube risk analysis analysis T • Quickly capturing project • Linking projects to • Determining the ability of • Proactively making • Improving insights on true • Improving alignment of ideas with greatest total business strategy and the organization to execute informed decisions to project performance and executives and project teams for economic value determining gaps or against a measured project's establish the proper hidden risks to enable effective operational trade-off alue• Providing consistency and cancelation decisions complexity and inherent foundation for successful decision-making for the decisions consistent with the risk, before starting execution to avoid greatest positive project project's success objectives unbiased analysis prior to • Balancing and issues and surprises impact in-depth ROI and business prioritizing the portfolio • Increasing the ability to • Giving clarity on stage-gate case analysis/development for the greatest overall influence outcomes by • Understanding forward • Ability to focus and tune criteria for more effective team Primary v investment, risk and reward adapting the project's looking risks along processes for increased project focus and objective-based design, team, processes defined success criteria performance and optimal “Go/No-Go” decisions at and controls benefit realization implementation Unlocking the value of your program investments | 3

1 Are you are doing the right projects? The global business Screening for project innovation value Innovation is how companies stay ahead of their competition; this means that landscape is littered successfully executing innovative projects will drive competitive advantage. However, with companies whose just successful execution is insufficient — first, organizations must identify and choose competition innovated the right projects in which to invest. The strategic leadership of innovation is not a natural activity for executives focused on them out of existence. managing a business. Financial reporting pressure, budgeting processes, customer and investor relations and risk-averse decision-making all contribute to a slow realization of potentially disruptive innovation in the organization. The key in helping executives identify project potential and then to enable them to nurture the most valuable and innovative programs is to have the right processes and tools in place to efficiently sift through all the project ideas in a consistent manner, in order to predict which projects are most likely to be successful. Additionally, resources will be better leveraged by concentrating efforts on the project ideas that are most important to the business. An effective screening of innovative project ideas requires a balanced analysis that can Idea screening analysis be performed efficiently, consistently and at the earliest possible time, i.e., prior to expending effort on a detailed “return-on-investment” (ROI) review or analysis. In this Project A way, resources are better focused and can be allocated to the project ideas with the 50 greatest merit. Inserting a pre-portfolio screening process that enables a balanced 25 management criteria is essential to the portfolio governance process. 1 EY has found that leveraging a concept called “inventive merit” provides an efficient 0 and effective screening for innovation ideas as a front-end to the portfolio management process. This analysis provides a balanced view that measures not only the quality and –25 Overall inventive merit Negative balance significance of the idea itself, but puts it into a larger context enabling a more informed decision process prior to the business case being developed. –50 Measuring inventive merit entails the examination of four areas: inventive concept, Inventive Embodiment Operational Market concept merit practice dynamics embodiment merit, operational practice and market dynamics. By having a balanced Project B view on the merits of a project idea across these four dimensions, companies can 50 prevent appealing projects with a low overall likelihood of success from being accepted, and avoid rejecting projects that are evaluated by only a single dimension but which 25 Overall inventive merit have a high inventive merit. Positive balance In practice, using project inventive merit screening process involves each team measuring 0 and mapping their project idea across these four dimensions. The result visually depicts the unique value dynamic for each potential project. In this manner, both sponsoring –25 teams and management have an early and more effective decision criteria prior to –50 investing resources in ROI and business case development. Inventive Embodiment Operational Market concept merit practice dynamics The diagrams illustrate the concept of balanced inventive merit screening. 1. This concept is based on George R. White’s research on “Management Criteria for Effective Innovation.” 4 | Unlocking the value of your program investments

Measuring project value and alignment with business strategy When examining an existing portfolio of projects, either for the first time or as part of a standard review process, it is important to identify inappropriate projects that do not support the corporate strategy and are not adding value. These projects are at an increased risk of failure and may limit the capital that is available to undertake more appropriate projects with higher inventive merit and reward. Investment resources are always limited, so organizations should always be keen to overcome such potential value leakage. While some organizations excel in the execution of project management, many still do not have a mature portfolio management process in place — this can cause issues with the strategic alignment of programs and projects. The result is that although the organization may deliver projects on time and within budget, the value delivered from those projects is not aligned to the organization’s strategy. This represents a misallocation of investment capital, essentially wasting project money in the portfolio. Typical issues faced by organizations who struggle with keeping their portfolio under control include: • Too many projects running at the same time that ultimately do not deliver the expected results because of a lack of focus or lack of select resources and underperformance • Strategic objectives that are not supported by a project or program • Wasted investment in a project or program that is not aligned to strategic objectives Leading practices leverage project portfolio management tools, processes and techniques to assist organizations in balancing their portfolio of projects. When analyzing a portfolio, examining multiple metrics within financial, benefit, status, alignment and economic value areas is advised. In this manner, management has a more effective decision criteria in determining whether a project should be stopped, accelerated, monitored as it is executed, or evaluated to improve value and achieve strategic goals. Project portfolio analysis EY’s toolset assists in identifying those projects in the portfolio that should be continued and accelerated. Importantly, it also identifies those projects that are candidates to be stopped, freeing up capital and skilled resources for more important initiatives. A B C Accelerate Monitor P alue Q E F For more information on how portfolio management onomic v X can unlock the value of your c G Stop K E program investment, please Evaluate Must-do H J see our Portfolio management L Y transformation report. ey.com/portfoliomanage Strategic alignment Unlocking the value of your program investments | 5

2 Are you ready to run a major project? Large programs are Measuring complexity and residual risk of the project Prior to starting an initiative, organizations often fail to understand the complexity more complex ... and residual risks of that project — a common cause of struggling projects. Companies and complexity that understand complexity (and properly adapt to it) have a much higher success rate when it comes to implementing large, high-value initiatives. Companies that do not take exponentially complexity properly into account may be able to execute smaller projects successfully, increases risk. but struggle with the unique dynamics of larger, more complex projects. Complexity drives risk, so the project’s governance, processes and controls — and the project team’s capability to understand and adapt to that complexity — will determine the residual risk of the project and have a direct impact on the success of the program. The goal should not be to reduce the complexity of the project, but to reduce the risk associated with that complexity — the residual risk of the project. Risk reduction is normally attempted by applying the organization’s standard governance, controls and processes; however, this approach generally is insufficient to control more complex projects and becomes an administrative burden for smaller, less complex projects. The objective is to reduce the overall risk profile so it is below the organization’s tolerance for risk for that category/class of project. The approach should be to adapt the projects’ governance, controls and processes, as well as the team’s maturity, to address the specific areas that are driving risk from the inherent complexity. Measuring and visualizing the complexity drivers of risks on a project allow early proactive measures to be taken to address these drivers and reduce the remaining (residual) risk to an acceptable level. It is important to identify the areas driving complexity within the project (i.e., team constituents, suppliers, time, organizational change, scope and development) and, more importantly, discover the areas where residual risks remain and can therefore be proactively addressed. Symptoms relating to the failure in properly addressing these areas will result in project performance issues downstream, representing a lost opportunity for early and less costly remediation. Complexity analysis EY has discovered 17 factors of complexity that seem to be the primary drivers of complexity and, therefore, risks in projects. This aids organizations in understanding of the size of the gap between the project’s complexity-based (inherent) risks and their S current ability (maturity) to effectively u p m 100% p a l i e e T r e c o manage those risks. We find that visually s y s 80% t s e t m n depicting the complexity/risk relationship e m 60% e r helps in management understanding and i u For more information on how q e 40% r decision-making. d measuring inherent and residual n a 20% If the complexity analysis tool identifies e risks of projects can unlock p o T c high residual risks in particular areas, the S 0% i m the value of your program governance, processes, tools and team e investment, please see our maturity should be adapted to match the Predicting program risks level of complexity being undertaken. Or t improves success report. Failure to properly adapt will lead to project gani men za y t lo ey.com/predictingrisk inefficiencies and suboptimal performance iona dep l d ch an a and outcomes. nge ent elopm v De 6 | Unlocking the value of your program investments

3 Is the project set up for success? Predicting project challenges The foundation for a successful program is set before the project even starts. Based on the analysis of key start-up areas, future challenges can be predicted. A lack of addressing, or taking shortcuts, in crucial start-up areas will lead to a significant impact on project success. EY has found that successful companies take the time to have effective pre-start reviews that assist in determining the degree of readiness in these critical areas, whereas unsuccessful organizations tend to wait until symptoms of unresolved risks and issues actually arise, then react by “firefighting” with problem solving and minimally effective decision-making. The challenge in modeling predictive risks prior to the project start is believability — at this stage, there are no actual symptoms of program risks; in fact, there is an atmosphere of unwarranted optimism. However, it is imperative that the project team provides a forward-looking view of anticipated risks to executives. This will allow adjustments to be made to the project early in its life cycle when there are more options available to address anticipated risks that are less costly to implement and that will minimize the overall impact of those risks to the project’s success. Predictive risk analysis provides insight into: • Areas that introduce risks — these areas will have a negative impact on the project and should be the focus of mitigation plans • Areas that mitigate risks — these areas will have a positive impact on the project and should be maintained and, if possible, strengthened • Risk neutral areas — these areas will have a marginal impact to the project, but this is often where low-effort improvements can have a high impact on success A forward-looking pattern-based analysis is critical in determining if projects are set up for success. The challenge is that most techniques used in industry today fall short in properly determining those aspects crucial for project execution effectiveness. A predictive risk analysis examines vital areas (project selection, governance and accountabilities; project management and the deadline effect; project team capability, discipline, credibility and multi-team collaboration; and supplier capacity) to determine if any of these are introducing risk, mitigating risk, or are neutral areas that could be improved. The resulting analysis will provide a visual view for all areas so that a determination can be made regarding the individual and/or combined area’s potential impact to project success more easily. Unlocking the value of your program investments | 7

Predictive risk analysis EY has developed a predictive risk analysis tool that helps determine areas that should be strengthened to stop introducing risk and areas that should be maintained to continue to mitigate risk. Forcefield analysis Project selection Governance Project management Team’s teaming capability Suppliers capability Multi-team collaboration Team discipline Program accountabilities Team credibility Deadline effect –200 –100 0 100 200 Force factor Impact on project success prediction Once the predictive risk analysis is complete and it is determined which areas are introducing risk, the impact on project success can be predicted. The impact is measured as the risk of missing, or experience slippage, on one of the factors for success. We have found six primary factors that define success and have to be considered in trade-off decisions for a project: time, cost, benefits, scope, quality and organization. As part of defining success factors for the project, the relative priority of these factors should be determined for decision trade-off purposes. At most, two of these factors should be the highest priority for the project (e.g., benefits and time), with the other factors being given successively lower priority. Identifying more than two factors as the highest priority for success limits the ability for making effective trade-off decisions, aligning project operational decision making at all levels and in implementing risk mitigation activities (i.e., decision empowerment). These success factor priorities must be communicated to the governing bodies and the project team so decisions are aligned throughout the project. 8 | Unlocking the value of your program investments

The predicted impact to the six factors is compared against the factor priority (which defines success of the project). If there is high risk that the success factors will be missed, or slippage experienced, then adjustments need to be made on the areas introducing risk, as described above, to lower the impact on the high-priority factors. If only low-priority factors have a high risk of being missed or slipping, the project may still be set up in an acceptable manner. Predicted risk impact Using predictive modeling that illustrates risks across the same six success factors allows leadership to more accurately determine the changes needed most aligned with that project’s success. Summary influencing risk factors Time 5 4 Organization 3 Cost 2 For more information on how 1 predicting risks and impacts 0 can unlock the value of your program investment, please see Quality Benefits our Predicting program risks improves success report. Scope ey.com/predictingrisk Unlocking the value of your program investments | 9

4 How well are your important projects doing? Measuring the risk state of your project Key stakeholders need accurate, relevant information so they can make effective decisions to mitigate risks and improve project success. All too often, project status reporting does not give leadership a true picture of how a project is doing until it is too late. There is usually political pressure to keep a project in a “green” status; there is also a tendency for information to get distorted as it is rolled up from the workstream level to the project level to the executive reporting level. This distortion and loss of transparency results in executives having an unwarranted optimism concerning the true project performance and its chances of success, which almost always leads to surprises arising late in the project execution. Determining the true risk state of the project involves looking objectively at both a non-distorted view of the current state performance across several dimensions, and at a forward predictive view. This means that the organization’s leadership can proactively make fact-based decisions that will have a direct impact on project success. Risk state analysis It is important to look not just at the discrete risk items, but, more importantly, the risk interdependencies across several dimensions. EY’s “Cube” framework has three primary domains — program governance, project management and technical solution — with For more information on how each domain having nine areas. The risk state of the project takes a multi-dimensional understanding the risk state risk view by assessing the risk of a total of 27 areas based on the type and complexity of of your important projects the project, plus the interdependencies among each facet across domains. can unlock the value of your After the initial risk state is identified and the desired risk state is determined, remediation program investment, please plans can be put in place to improve the chances of project success. When determining see our Building confidence in the desired risk state, the goal is not necessarily to get the entire cube “green” — the goal executing IT programs report. should be to focus on the root-cause drivers and specific areas that will have the greatest impact on planned benefits and outcomes. Also, care must be taken to ensure that the ey.com/ITprm risk and opportunity plans are sequenced appropriately to mitigate risks in the most effective order and to maximize opportunities. 10 | Unlocking the value of your program investments

Program governance Benefit realization and Capability and sustainability maturity Complexity Performance profile management Business case Organizational Benefits, integrity change design and management realization Decision Compliance and framework regulatory Scope Technical management Governance infrastructure Time effectiveness Methodology management and development Human Cost Requirements resource management engineering Controls Technical solution management and design Requirements development, Security, Procurement business quality and transition management continuity and disaster recovery Quality Integration Data Sustainability management management management model Risk Cutover management and Testing support Communications and management validation Risks or issues identified that require management attention Project management and have a direct impact on planned outcomes Processes, controls Risks or issues identified; processes must be adjusted and predictability and greater emphasis is required Minor or no issues identified — does not require management attention Not a priority action at this time The diagram above shows an example of a risk-state analysis. The red areas represent the highest risks that should be addressed first. From this initial analysis, a desired risk state should be determined (which may not be all “green”). Then remediation plans can be developed to get from this risk state to the desired risk state. If there are dependencies among the areas, certain red and even selected yellow areas may need to be addressed prior to others. A typical recovery progression Current state Step 1 Step 2 Step 3 Requirements Requirements Requirements Requirements engineering engineering engineering engineering Project Testing Project Testing Project Testing Project Testing Methodology strategy Methodology strategy Methodology strategy Methodology strategy Project plan Risk Transformational Project plan Risk Transformational Project plan Risk Transformational Project plan Risk Transformational and schedule management change management and schedule management change management and schedule management change management and schedule management change management Issues Cutover and Issues Cutover and Issues Cutover and Issues Cutover and management conversion strategy Sales management conversion strategy Sales management conversion strategy Sales management conversion strategy Sales Complexity and Complexity and Complexity and Complexity and management Quality marketing management Quality marketing management Quality marketing management Quality marketing Decision management Decision management Decision management Decision management framework framework framework framework and Engineering and Engineering and Engineering and Engineering empowerment empowerment empowerment empowerment Role and Objective GSP design Supply Role and Objective GSP design Supply Role and Objective GSP design Supply Role and Objective GSP design Supply responsibility and outcome and Oracle chain responsibility and outcome and Oracle chain responsibility and outcome and Oracle chain responsibility and outcome and Oracle chain management solution management solution management solution management solution Projecy goal/ Projecy goal/ Projecy goal/ Projecy goal/ capability Manufacturing capability Manufacturing capability Manufacturing capability Manufacturing alignment alignment alignment alignment Scope and Performance Reporting Scope and Performance Reporting Scope and Performance Reporting Scope and Performance Reporting change management Projects change management Projects change management Projects change management Projects control control control control Situational Situational Situational Situational awareness Customizations awareness Customizations awareness Customizations awareness Customizations Governance Governance Governance Governance process Finance process Finance process Finance process Finance effectiveness effectiveness effectiveness effectiveness Unlocking the value of your program investments | 11

5 Are your people aligned toward success? Measuring priority and empowerment alignment EY’s experience has shown that a majority of decisions are made by the project team with only a few being made by executives; therefore, it is critical that priorities are aligned throughout the project so that the project team makes decisions that are aligned with leadership’s definition of success. When measuring alignment, we utilize the same success factors identified previously — time, cost, benefits, scope, quality and organization. From our work with challenged organizations, we have found that when decision alignment is poor: • Decisions are revisited and overturned as stakeholders with higher authority change decisions to align with their own priorities. • Decisions are delayed as the team tries to get consensus among stakeholders with competing priorities. • The team becomes frustrated and refuses to make decisions that they are responsible for, delaying risk and issue escalation (passive-aggressive), or they start making decisions not aligned with the overall project success. Poor decision priority alignment occurs more frequently on large complex projects since there are many more communication points between executives and the project team. This means that only select information is communicated, less often and more formally than on smaller projects. When this misalignment occurs, we have found that it is very common that resources will align with the priorities of their functional areas, i.e., finance resources will align with the priorities of the CFO (usually “cost” and “benefits”), IT resources will align with the priorities of the CIO (usually “time” and “cost”) and operations resources will align with the priorities of the COO (usually “scope” and “quality”). This is why, prior to the start of the project, the priorities of the six success factors must be agreed upon and communicated to the governing bodies and the project team. 12 | Unlocking the value of your program investments

Decision priority analysis A visually depicted decision framework helps to determine if a priority misalignment exists within and across governance tiers (including suppliers) that could lead to decision-making disconnects on the project — a key reason why many projects become challenged. The diagrams below show an example of a priority alignment analysis. The degree of alignment needs to consider both alignment across each governance tier (horizontal alignment), and between each governance tier (vertical alignment). The degree of misalignment, each horizontally or vertically, will impact effective decision-making. Schedule 5 Organizational 4 impact 3 2 Cost 1 0 Executives Quality Scope Benefits Schedule t 5 en Organizational 4 m impact 3 Cost ign 2 al 1 al 0 Leads c i t er Quality Scope v f o e e Benefits gr e D Schedule 5 Organizational 4 impact 3 Cost 2 For more information on how 1 improving the decision alignment 0 Team of your important projects can unlock the value of your program Quality Scope investment, please see our Building confidence in executing IT programs report. Benefits ey.com/ITprm Degree of horizontal alignment Unlocking the value of your program investments | 13

14 | Unlocking the value of your program investments

Conclusion Portfolio management and predictive analytics can help your organization successfully execute projects Organizations that are successful in delivering large and complex programs outperform Successfully executing their competitors in the market. It is the new basis of competition. The problem is that many organizations spend effort executing the wrong projects and thus waste some of innovative projects their valuable (and limited) resources. will drive competitive The key is to help executives identify projects with the best potential and then to enable them to nurture the most valuable and innovative programs. This requires having the advantage. right processes and tools in place to assist organizations in balancing their portfolio of projects. The ability to have a forward-looking view of risks and being able to predict the impact of those risks allows the organization to proactively manage projects. Surprises late in the project life cycle are costly and difficult to recover from. Being able to make adjustments to the project’s governance, controls and processes prior to the onset of issues allows the organization to increase the success of their strategic programs. The early identification of necessary corrective actions and predictive risks leads to greater control of program performance and accelerated benefits achievement, resulting in: • Reduced project cost • Reduced project time • Increased benefit realization • Improved time to benefits • Improved return on capital investments • Increased competitive posture How can EY help? Our ability to provide a holistic fact-based objective risk view, from project selection to portfolio development, to project planning and through project execution, will help you unlock the value of your program investments. The differentiator is our ability to predict risks, understanding their future impacts and thereby making informed decisions to improve program performance. We can help your organization regain control of your strategic programs and deliver meaningful value, fully aligned with your organization’s business strategy and risk tolerance. Depending on your particular need, we can assist in various reviews as outlined in this report. This can provide a comprehensive view of your organization’s risk position to support effective risk management. We can also assist in developing a prioritized road map, and provide support and assistance in addressing those critical areas that will have the greatest positive impact. We can help you to effectively manage your key risks and strengthen your organization’s ability to successfully deliver large, complex projects. Unlocking the value of your program investments | 15

Want to learn more? Insights on governance, risk and compliance is an ongoing series of thought leadership reports focused on IT and other business risks and the many related challenges and opportunities. These timely and topical publications are designed to help you understand the issues and provide you with valuable insights about our perspective. Please visit our Insights on governance, risk and compliance series at ey.com/grcinsights. Portfolio management Building confidence in executing IT Predicting project risks improves transformation: how to effectively programs: how proactive program success: how predictive analytics screen and align your program risk management provides warranted provides the insight to unlock the portfolio with strategic objectives confidence in achieving program success value of your program investments ey.com/portfoliomanage ey.com/itprm ey.com/predictingrisk Cyber program management: Expecting more from risk Maximizing value from your lines of identifying ways to get ahead management: drive business results defense: a pragmatic approach to of cybercrime through harnessing uncertainty establishing and optimizing your LOD model ey.com/cpm ey.com/repm ey.com/lod Get ahead of cybercrime: Centralized operations: the future Building trust in the cloud: EY’s Global Information of operating models for Risk, creating confidence in your Security Survey 2014 Control and Compliance functions cloud ecosystem ey.com/giss ey.com/centralops ey.com/cloudtrust 16 | Unlocking the value of your program investments

At EY, we have an integrated perspective on all aspects of organizational risk. We are the market leaders in internal audit and financial risk and controls, and we continue to expand our capabilities in other areas of risk, including governance, risk and compliance, as well as enterprise risk management. We innovate in areas such as risk consulting, risk analytics and risk technologies to stay ahead of our competition. We draw on in-depth industry-leading technical and IT-related risk management knowledge to deliver IT controls services focused on the design, implementation and rationalization of controls that potentially reduce the risks in our clients’ applications, infrastructure and data. Information security is a key area of focus where EY is an acknowledged leader in the current landscape of mobile technology, social media and cloud computing.

EY | Assurance | Tax | Transactions | Advisory About EY About EY’s Advisory Services EY is a global leader in assurance, tax, transaction and advisory services. The insights Improving business performance while managing risk is an increasingly complex and quality services we deliver help build business challenge. Whether your focus is on broad business transformation or, trust and confidence in the capital markets more specifically, on achieving growth or optimizing or protecting your business, and in economies the world over. We develop having the right advisors on your side can make all the difference. outstanding leaders who team to deliver on our promises to all of our stakeholders. In Our 30,000 advisory professionals form one of the broadest global advisory so doing, we play a critical role in building a networks of any professional organization, offering seasoned, multidisciplinary better working world for our people, for our teams that work with our clients to deliver a powerful and exceptional client clients and for our communities. service. We use proven, integrated methodologies to help you solve your most EY refers to the global organization, and may challenging business problems, deliver a strong performance in complex market refer to one or more, of the member firms of conditions and build sustainable stakeholder confidence for the longer term. We Ernst & Young Global Limited, each of which is understand that you need services that are adapted to your industry issues, so we a separate legal entity. Ernst & Young Global bring our broad sector experience and deep subject matter knowledge to bear in a Limited, a UK company limited by guarantee, proactive and objective way. Above all, we are committed to measuring the gains does not provide services to clients. For more and identifying where your strategy and change initiatives are delivering the value information about our organization, please your business needs. visit ey.com. © 2015 EYGM Limited. To find out more about how our Risk Advisory services could help your All Rights Reserved. organization, speak to your local EY professional or a member of our global EYG no. AU3050 team, or view ey.com/advisory. BMC Agency Our Risk Advisory leaders are: BACS 1001711 Global Risk Leader ED None Paul van Kessel + 31 88 40 71271 [email protected] In line with EY’s commitment to minimize its impact Global Risk Transformation Leader on the environment, this document has been printed on paper with a high recycled content. Matt Polak + 1 412 644 0407 [email protected] This material has been prepared for general informational purposes only and is not intended to be relied upon as Global Program Risk Management Leader accounting, tax, or other professional advice. Please refer to your advisors for specific advice. David Thomae + 1 617 375 1318 [email protected] ey.com/grcinsights Area Risk leaders Americas Amy Brachio + 1 612 371 8537 [email protected] EMEIA Jonathan Blackmore + 971 4 312 9921 [email protected] Asia-Pacific Iain Burnet + 61 8 9429 2486 [email protected] Japan Yoshihiro Azuma + 81 3 3503 1100 [email protected]