19 ISSUED: NOV. 2021 Water Conservation Our water neutrality target means we offset our operational water use through onsite treatment or reuse, or by funding water conservation projects in our operational and growing regions. At PM USA's Park 500 facility, we treated over 280 million gallons of water in 2020 before returning it to the James River. The facility uses innovative techniques to reduce nitrogen and phosphorus levels in the facility’s wastewater, including 48 acres of engineered wetlands that use plants to absorb the nutrients in the wastewater and create a new wildlife habitat. At PM USA’s manufacturing center, we utilize a water reclamation hub to reduce the amount of water we take from the local utility. We take wastewater from our manufacturing process and facilities, treat it onsite by removing debris and other contaminates from the water, and reuse the water in our cooling towers and HVAC systems. In 2020, we were able to reuse over 117 million gallons of water through this process. 2030 109.7% 53.4% 46.4% 59.5% 2019 2020 2018 2017 0% 150% Percent Target: >100% 2030 Target: Achieve 100% water neutrality each year Water Neutrality Onsite Treatment/Reuse Conservation 10.6% 10.3% 8.7% 9.2% 42.8% 3 7.7 % 50.3% 99.4%

Altria Protect the Environment Report - Page 19 Altria Protect the Environment Report Page 18 Page 20